Work in full swing to plug breach at Dhakka Basti;DC reviews operations

plugging , work, fullswing,

Work in full swing to plug breach at Dhakka Basti;DC reviews operations




LOHIAN KHAS

 

 With a view to reviewing the ongoing work to plug the major breach in Dhussi bandh of Satluj river at Dhakka Basti, Deputy Commissioner Vishesh Sarangal on Sunday evening visited the site. The Deputy Commissioner also expressed satisfaction over the pace of work as more than 200 feet of breach had been covered.

The Deputy Commissioner interacted with the officials and people reaching from different areas with loaded trollies of gunny bags filled with sand. He also asked the police officials to make sure that the way of bandh leading to the breach site should be cleared for smooth movement of trollies and tippers bringing soil and sand.


 ADC (Development) Varinder Pal Singh Bajwa, who is monitoring the entire work, apprised about round-the-clock work, Sarangal emphasized that the late evening operations should be safe and secure. He assured the farmers and residents that the gap would be covered in days to come by deputing extra teams for this purpose. He said bringing gunny bags of sand is a continuous process, which would pave the way to cover a nearly 900 feet breach. He said the water level was also receding gradually that too would be helpful in plugging the breach. The Deputy Commissioner said that teams of District Administration, NDRF, SDRF, Health, and other departments were on their toes to provide every possible assistance to the residents facing a crisis due to natural calamity.


Jul 16 2023 8:02AM
plugging , work, fullswing,
Source: